







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Plant Prefab Bathroom Remodeling: The North Miami Owner’s Guide
We install Plant Prefab-compatible bathroom components and full bathroom remodels for North Miami homeowners, with installed projects typically running $10,620 to $33,040 depending on scope, fixtures and finish level. Small bathrooms land lower, around $5,900 to $14,160. We give you a written price before any work starts, so the number you approve on day one is the number on your invoice.
Most owners don’t discover a Plant Prefab bathroom problem all at once. It shows up slowly: a vanity cabinet that swells at the base after a summer of humidity, a shower pan that flexes underfoot, a shower valve that runs hot then cold when someone flushes a toilet. You notice the symptom, you start searching for the part, and then you hit the real problem: Plant Prefab’s modular wall assemblies and panelized wet walls aren’t cut to the dimensions a stock big-box fixture expects. That’s where we come in. We get the right component, and we install it to fit the opening you actually have.
To be clear about who we are: Penhallow Remodeling North Miami is an independent service provider and is not affiliated with Plant Prefab. We work with owners who already have the product in place.
Which Plant Prefab Models This Applies To

Plant Prefab builds to a range of panelized and modular systems, and the bathroom assembly on each one has its own dims and service access. The two things that trip owners up most often are rough-opening dimensions and structural backer placement. A stock 30-inch vanity can be a quarter-inch too wide for a Plant Prefab panelized alcove once tile and backer are calculated in, and a surface-mount medicine cabinet can find no stud where the panel system expects a specific blocking location. Measure the finished opening, not the bare framing, and photograph the labels inside the panel for reference. If you can’t find a model or serial label, your closing documents and the original build spec usually carry the panel schedule.
On the OEM-versus-aftermarket question: for the shower valve body, drain assembly and any waterproofing membrane tied to the wall panel system, use original-spec or a direct-compatible equivalent. Those are the components where a near-match fails. For faucets, sinks, vanities and lighting, a quality aftermarket brand works well as long as the rough-in dimensions match. We install Kohler and Moen fixtures, KraftMaid and Wellborn vanities, and Cambria, Silestone or Caesarstone countertops. None of those are carried on a truck; we source and order the exact part for your opening. If you’re weighing cabinet lines elsewhere in the home, we also service KraftMaid, Cambria and Silestone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Plant Prefab Bathroom Remodeling Is Failing
- A shower pan that flexes or feels soft. That usually means the drain connection or the membrane beneath the pan has failed, and water is reaching the substrate. Left alone in North Miami’s humidity, a soft pan turns into a rotted threshold within a season.
- Grout and caulk that crack along the wall panel seams. Movement at the panel joints, not bad caulk, is the cause. Recaulking buys weeks; the joint needs to be looked at, not just resealed.
- A vanity base that swells or stays damp. The panelized wall behind it isn’t shedding moisture the way it should. Bathroom cabinet board that stays wet is past saving and needs replacing.
- A shower valve that changes temperature when another fixture runs. The pressure-balancing cartridge has worn out. This is a small part with an outsized effect on comfort.
- Water staining at the ceiling or floor below the bathroom. The membrane or a supply line is leaking inside the wall. This is the one to treat as urgent, because the damage behind the panel is always worse than what you see.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Installed prices for North Miami bathroom work, using our written line-item pricing, run in these ranges:
| Project | Installed price range |
|---|---|
| Full bathroom remodel | $10,620 – $33,040 |
| Small bathroom remodel | $5,900 – $14,160 |
| Walk-in shower installation | $5,310 – $14,160 |
| Tub-to-shower conversion | $4,130 – $11,800 |
| Shower replacement | $3,540 – $10,030 |
| Bathroom vanity installation | $945 – $3,540 |
What drives the number up or down: whether the membrane and pan stay or get rebuilt, the fixture line you choose, tile versus a solid-surface surround, and whether the wall panels need to be opened to reach a leak. You get a written scope and a written price before demo. The work carries our 365-Day Done Right Promise, and the fixtures carry their own manufacturer warranties alongside it. If the install fails inside the year, we come back and fix it at no charge.
DIY or Call Us?
You can safely handle the small stuff yourself. Check the caulk lines, watch for a soft shower pan, look under the vanity for moisture, and note whether the shower valve drifts in temperature. That’s diagnosis, not repair, and it’s useful.
Where DIY goes wrong for these systems: the waterproofing layer and the drain connection. Cutting into a panelized wet wall to “just replace the pan” almost always reaches the membrane, and a membrane you don’t fully rebuild will leak behind the wall where you can’t see it. The supply plumbing is another one. Work behind the wall on a pressurized line is where we see homeowners call us after a weekend of trouble. Let a trained professional handle anything that touches the waterproofing, the drain, or the supply lines. Call us at (888) 255-7411 and we’ll tell you honestly what needs a pro and what doesn’t.
FAQs

Plan on 10 to 15 years for a shower pan and membrane in this climate, shorter if the bathroom doesn’t ventilate well. North Miami’s humidity and near-daily summer rain put steady strain on the wet wall, and a bathroom without a working exhaust fan will see the membrane fail earlier than the same system in a dry climate.
Sometimes, yes. A worn valve cartridge or a failed caulk joint gets repaired. A soft pan, a water-stained wall cavity, or a swollen vanity base gets replaced, because the damage behind it is already done. We’ll tell you which one you’re looking at before quoting anything.
A single component swap like a vanity or a shower valve usually takes under a day. A shower replacement or a full bathroom remodel runs longer depending on scope. We give you a real arrival window and stick to it.
We identify your panel system and opening dimensions first, then order the matching OEM or direct-compatible part. We don’t keep Plant Prefab parts on a truck, so lead time depends on the component. Your written price includes the part and the labor, so there are no surprise charges when it arrives.
We’re a general contractor based in North Miami and we work on bathrooms and whole-home remodels across the area. You get a written price before any work starts, background-checked technicians in uniform, and a real person on the phone 24/7. Call (888) 255-7411 to schedule your free estimate.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.












