







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The North Miami Owner’s Guide
Home additions and ADUs for Mr-Glass door and window systems in North Miami typically run $53,100 – $153,400 for an addition and $106,200 – $259,600 for a full ADU, and the work is scheduled as a planned project, not a same-day repair. When a Mr-Glass opening starts leaking at the sill or the door stops latching clean inside its frame, that’s usually the sign the surrounding rough opening or header has moved. In North Miami, that movement shows up most in additions built before the 2002 Florida Building Code updates, where wind-load anchoring wasn’t what it is now.
Which Mr-Glass Models This Applies To

Mr-Glass is known for hurricane-rated impact windows and doors, and additions and ADUs tie into those openings at the rough opening, not the unit itself. If your home has Mr-Glass sliders, hinged doors, or fixed impact units, the part that fails around them isn’t the glass; it’s the frame, header, sill pan, or flashing where the addition meets them. You’ll find the series label on the interior jamb of each unit, usually a small metal tag with a model prefix and glass make-up. Write that number down before you call anyone.
The OEM-versus-aftermarket call is real here. Mr-Glass replacement sashes and impact glazing assemblies are proprietary, and a generic window won’t match the rated assembly. Framing lumber, flashing tape, and sill pans, on the other hand, are commodity parts. A quality aftermarket sill pan installed to the manufacturer’s spec performs the same as OEM; a mismatched sash does not. We order Mr-Glass-compatible components directly and don’t claim to stock them.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Home Additions & ADU Is Failing
- Water staining at the sill or baseboard under a Mr-Glass unit. The sill pan or flashing has failed, letting wind-driven rain past the opening. In North Miami, this shows up first on east- and south-facing walls after hurricane season.
- Door or window won’t latch or bind in the frame. The header above the opening has deflected or the rough opening has shifted. This is a structural signal, not a hardware problem.
- Visible gaps or daylight around the frame. Sealant and backer rod have dried and pulled away, common in South Florida’s UV load and heat cycling.
- Soft or crumbling drywall at the corner of an addition. Moisture is migrating behind the finish, often from a failed flashing detail where the addition roof meets the original wall.
- Sticking impact units on a newly built ADU. The assembly has settled or the shims have compressed; the fix is re-setting the opening, not replacing the door.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Replacement and repair pricing on Mr-Glass-adjacent openings in North Miami depends on scope, not on a flat part price. A sill pan and flashing rebuild around one unit lands well below a full opening reframe; a header repair or rough opening re-set runs higher because it involves structural carpentry and inspection. Home addition work overall sits at $53,100 – $153,400, and ADU construction at $106,200 – $259,600.
Every quote we give is a written line-item price before work starts: labor, materials, permits, and inspection costs listed separately. That number on day one is the number on the invoice. The work carries our 365-Day Done Right Promise in writing, and if something we installed fails inside that window, we come back and fix it at no charge.
DIY or Call Us?
An owner can safely check a few things: look for water staining under a Mr-Glass unit, feel for soft drywall, test whether a door latches clean, and photograph the series label on the jamb. Those observations help us quote accurately over the phone. What an owner should not attempt is opening up a header, re-flashing a rough opening, or re-setting an impact-rated assembly. The structural and wind-load work on an addition or ADU in North Miami requires permits, inspections, and a licensed contractor, and an improperly anchored impact opening can fail in a storm. Call (888) 255-7411 and we’ll tell you what we see and what it costs.
FAQs

How long does a Mr-Glass-compatible addition or ADU component last in North Miami? Framing and flashing details done to current Florida Building Code typically last 25 – 30 years, but sun and salt air shorten sealant and flashing life to 8 – 12 years. UV exposure is the biggest factor; we inspect the opening details on every project.
Can the part be repaired instead of replaced? Often yes. A failed sill pan or flashing can be rebuilt without touching the Mr-Glass unit itself, and a binding door can usually be re-set rather than replaced. We look for the repair first because it’s cheaper for you. Call (888) 255-7411 for a free estimate.
How long does the swap take? A flashing or sill detail rebuild around one opening usually takes a day; a header repair or rough opening re-set takes two to four days including inspection. We give you a written arrival window and hold to it.
How do you source the part? We order Mr-Glass-compatible components directly from the manufacturer and don’t stock parts or carry them on a truck. We’re an independent service provider and not affiliated with Mr-Glass, but we know the product line and can match the right component to your model.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.












