







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boxabl Home Additions & ADU: The North Miami Owner’s Guide
We build Boxabl-compatible additions and accessory dwelling units in North Miami, and the installed cost runs from $53,100 to $153,400 for a home addition and $106,200 to $259,600 for a full ADU. The lead time depends on permitting and your lot, not on the calendar we keep, so we quote you a start window and hold it. Most North Miami owners land on this page after a walk-through shows something off: a settled threshold, a hairline seam where the module meets the addition, or a section of wall that flexes. Those are the calls we get most.
Penhallow Remodeling North Miami is an independent provider. We are not affiliated with Boxabl and we don’t claim to be the manufacturer.
Key Takeaways
- Installed home addition: $53,100 – $153,400. Installed ADU: $106,200 – $259,600.
- We give you a written price before any work starts, and that number is what’s on the invoice.
- Every project carries our 365-Day Done Right Promise in writing.
- A live person answers our phone around the clock.
Which Boxabl Models This Applies To

Boxabl’s line has moved through a few revisions, and the connection details that matter to an addition or ADU are different between the earlier Casita panels and the newer wall assemblies. The first thing we do on a North Miami site visit is read the data plate and the panel stamps on the unit itself. Those tell us the panel thickness, the stud spacing and the anchor pattern, which is what everything else hangs on. Don’t trust the sales folder. Trust the stamp.
Before we order anything, you’ll want to identify three things:
- The panel series – stamped on the interior face of the wall panels, sometimes behind a trim piece.
- Anchor and connection hardware – the tie-downs and plate connectors where the module meets a foundation or an adjoining structure. The hardware changed between series, and a mismatched connector is the single most common compatibility gotcha we see.
- The utility stub-out locations – where the water, power and drain leave the unit. Additions and ADUs tie into these, and the routing has to match the model you have.
On the OEM question: Boxabl-specific connectors and trim pieces are worth the money where they exist, because they’re sized to the panel and they fit. For general framing, sheathing and finish materials we use recognized trade brands, including KraftMaid and Wellborn cabinetry and Cambria and Silestone surfaces where a kitchen or bath is part of the scope. That’s the same standard we hold on every remodel we run in North Miami.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Boxabl Home Additions & ADU Is Failing
Most failures here aren’t dramatic. They show up as small things that get worse. If you’re seeing any of these in North Miami, it’s worth having someone look before the rainy season does the inspection for you.
- A seam that’s opening where the addition meets the unit. Usually a connection or sealant failure. The panels haven’t moved; the hardware and the weather seal between them have.
- Water staining or soft drywall near a penetration. A flashing or stub-out seal has let moisture in. In North Miami’s humidity, this turns into mold faster than most homeowners expect, often within a few weeks.
- A door or window that’s sticking or dragging. Often a sign of settling at the foundation or a shifting anchor, not a hinge problem.
- Musty smell inside an enclosed room or addition. Poor vapor control at the new-to-old junction. Very common when an addition was closed up without a proper moisture barrier.
- Visible flex or movement in an added wall. Usually undersized or incorrectly anchored framing. This is the one I’d want eyes on soonest.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what North Miami owners actually pay, and what’s inside the number.
| Scope | Installed Price Range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
What drives the range: square footage, whether we’re tying into an existing slab or pouring new, the utility work, and finish level. A 300-square-foot bump-out is a different job than a full detached ADU with its own kitchen and bath. Materials pull the number too. Cambria or Silestone in an ADU kitchen sits higher than a basic laminate, and we’ll show you both in the quote.
Every quote is a written line-item price before work starts. No change orders mid-project unless you ask for something new. Every job carries the 365-Day Done Right Promise: if something we built fails inside the year, we come back and fix it at no charge. If a repair we did fails, the return visit is free. No service call, no reinspection fee.
DIY or Call Us?
Some checks are safe to do yourself. Walk the perimeter and look for cracked sealant or staining at penetrations. Note any door that’s started to drag. Take photos of the data plate and panel stamps. Write down what you see and when it started.
What I’d steer you away from: resealing or re-anchoring a structural junction between an addition and a module on your own. If a connector has backed out or a wall is flexing, you’re working on load-bearing hardware, and getting that wrong is how a small repair becomes a structural one. That’s a job for someone who’s trained and carries insurance. Same goes for electrical and gas tie-ins, which are always permit work.
Measurements and photos are the fast, free thing. If something looks loose or wet, call us at (888) 255-7411. A live person answers, day or night. We’ll schedule a walk-through, and the estimate is free.
FAQs

With proper moisture control and maintained seals, a well-built addition or ADU serves 30 to 50 years. North Miami’s heat, humidity and salt air are the hard part; the build is only as good as its weather sealing and ventilation. We build with that climate in mind, and the 365-Day Done Right Promise covers the first year of workmanship.
Often yes. A failed seal or an opening seam can usually be re-sealed and re-anchored without tearing anything out. Framing or foundation failures are more likely to need real replacement. We’ll tell you which one you’re looking at, with a written price either way, before you commit.
A modest addition runs about 10 – 16 weeks once permits are in hand. A full ADU typically runs 4 – 7 months. Permitting in North Miami adds its own timeline, and we tell you what that looks like before you sign.
We source model-specific connectors and trim through the manufacturer channel where they’re available, and match the rest to the panel specs from your unit’s data plate. We don’t claim to stock Boxabl parts locally, so we confirm lead times before work starts and put the number in writing.
No. The written price is the invoice price. If we hit something behind the wall you didn’t know about, we stop and quote it to you before touching it. That’s The Kingswell Way: say the price before the work, show up in the window we gave, leave the place cleaner than we found it.
Ready for a walk-through? Call (888) 255-7411 for a free estimate on your Boxabl-compatible addition or ADU in North Miami.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.












