







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Dvele Bathroom Remodeling: The North Miami Owner’s Guide
A full Dvele bathroom remodel in North Miami typically runs $10,620 to $33,040 installed, depending on layout, tile, vanity line and fixture tier. Smaller powder rooms and half-baths land at the bottom of that range; primary baths with a walk-in shower and double vanity land near the top. We’re an independent remodeling contractor and we’re not affiliated with Dvele, but we work on Dvele homes across North Miami and we know how their panel-set bathrooms go together. Most owners find us after a soft spot shows up at the shower curb, a vanity cabinet swells at the base, or grout starts cracking in a line across the floor. When water gets behind the tile in a Dvele bath, it usually shows up in the same three places every time.
Which Dvele Models This Applies To
Dvele builds modular and panelized homes, and the bathroom assemblies differ by series. Their larger single-family lines (the two-story and primary-suite-heavy plans) typically use a standard 60-inch alcove tub or a 48-to-60-inch curbless shower pan with a factory-set drain location. The compact and ADU plans often ship with a 36-inch shower and a single-sink vanity. The compatibility gotcha is the drain setout: Dvele’s panel floors fix the rough-in drain in one spot, so a replacement pan or tile shower base has to match that measurement to the inch. Pull the label inside the vanity cabinet door or on the electrical panel cover, note the model and series, and measure the shower opening and the drain centerline from the wall before you order anything. On OEM versus aftermarket: Dvele doesn’t manufacture tile, fixtures or vanities, so there’s no reason to chase a “Dvele brand” part. Matching the panel dimensions and the plumbing rough-in to a quality fixture is what matters, and that’s the decision we help North Miami owners make on every job.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Dvele Bathroom Remodeling Is Failing
- Soft or spongy floor at the shower curb. Water has been wicking past the curb for a while and the cement board or subfloor underneath has taken it. In North Miami’s humidity, that wood doesn’t dry out, it keeps rotting.
- Grout cracks in a straight line across the floor. That’s usually movement in the substrate, not a grout problem. The layer under the tile (the cement board or backer) has flexed or separated from the joists.
- Vanity cabinet swelling at the bottom corners. A slow supply-line drip or a bath mat that never dries will do this. By the time the toe kick looks puffy, the cabinet box is already compromised.
- Mildew that keeps coming back in the same spot. A shower that stays damp for days has an airflow or drainage problem, and Florida’s year-round moisture means it will keep returning until the cause is fixed, not just scrubbed.
- Loose or hollow-sounding tiles near the drain. Tap a few with a screwdriver handle and listen. A hollow ring means the thinset has let go, and water is likely already under the tile.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For North Miami, a full bathroom remodel runs $10,620 to $33,040 installed. A small bathroom remodel, such as a half-bath or a narrow guest bath, comes in at $5,900 to $14,160. If you’re only converting a tub to a shower, that’s $4,130 to $11,800, and a straight walk-in shower installation runs $5,310 to $14,160. A standalone shower replacement is $3,540 to $10,030, and a vanity swap alone is $945 to $3,540.
What drives the number up or down: tile choice, whether the shower pan and drain have to be reset, and whether we find hidden water damage at demo. We give you a written price before any work starts, so the number on day one is the number on the invoice. The price includes labor, materials and permit coordination where required. If the work fails inside 365 days, our Done Right Promise means we come back and fix it at no charge, and that’s in writing on every project.
DIY or Call Us?
Some things you can check yourself. Confirm the model and series label on your vanity or electrical panel. Measure the shower opening and drain centerline. Look for soft spots at the curb and tap tiles near the drain for hollowness. What we don’t recommend is tearing into a wet shower pan or re-tiling over a compromised substrate on your own. Once the backer board is wet, patching over it traps the moisture and the failure comes back within a season. And a tile shower tied into Dvele’s panel floor has to hit that drain setout exactly, or you’re cutting into the panel. That’s the kind of work we’d rather you call us on. Ring (888) 255-7411 and we’ll get you a written price before anything gets pulled.
FAQs

How long does a Dvele bathroom remodel last in North Miami? A properly built bathroom with a sealed substrate, waterproofing membrane and quality tile will hold 20 to 30 years before the finishes need replacing. The pieces that fail early are almost always the shower pan and the caulk lines, and both fail faster in South Florida’s humidity unless they’re maintained.
Can the old bathroom be repaired instead of fully replaced? Sometimes, yes. A vanity or a shower valve can be swapped on its own, and a grout-and-caulk refresh is a real option if the substrate is still sound. But if the floor is soft at the curb or tiles sound hollow near the drain, the substrate has to come out, and patching it usually costs more down the line. Call (888) 255-7411 and we’ll tell you honestly which side you’re on.
How long does the job take? A powder room or half-bath typically runs 1 to 2 weeks. A full bath with a new shower pan and tile runs 3 to 4 weeks, and a tub-to-shower conversion is usually 2 to 3 weeks once materials are on site. We give you a real arrival window and a schedule in writing before we start.
How do you source the parts for a Dvele home? We match to the panel dimensions and plumbing rough-in rather than chasing a Dvele-branded part, since the fixtures themselves come from standard manufacturers. When it supports the build, we use recognized trade brands: Kohler and Moen for fixtures, KraftMaid and Wellborn for cabinetry, and Cambria, Silestone and Caesarstone for countertops. Each of those carries its own manufacturer warranty alongside our own written guarantee on the work.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.
If you’re in North Miami and your Dvele bathroom is showing water damage at the curb, a soft vanity, or grout that keeps cracking, call (888) 255-7411 for a free estimate. A live person answers around the clock, and you’ll have a written price before any work begins.












