







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Home Additions & ADU: The North Miami Owner’s Guide
If you’re planning an IKO-based addition or accessory dwelling unit in North Miami, installed costs typically run $53,100 – $153,400 for a home addition and $106,200 – $259,600 for a full ADU, with garage conversions landing around $35,400 – $94,400. We’re an independent remodeling contractor, not affiliated with IKO, but we build to IKO system specs and pull every permit the work requires.
Most owners don’t start here by accident. They start with a specific failure: a hairline crack spreading across a finished wall, a ceiling stain that keeps coming back after the drywall was patched, a corner where the roofline of the addition has visibly pulled away from the main house. In North Miami, where ocean-driven rain pounds the east and west faces of a structure and the summer sun bakes everything in between, those small failures usually trace back to a tie-in detail that was rushed the first time.
Which IKO Models This Applies To

IKO doesn’t sell additions or ADUs as standalone products the way it sells roofing shingles or waterproofing membranes. What matters on your project is which IKO components are already on the structure: the roofing system, the underlayment, the waterproofing details where the new addition ties into the existing roofline. IKO’s shingle lines (Cambridge, Dynasty, Nordic) and its waterproofing membranes show up on North Miami homes more than most owners realize, because a lot of the builders who worked this market for the last two decades used them.
Identifying the right part means reading the labels, not guessing. Shingle bundles are stamped on the wrapper. Membrane rolls carry the product name and thickness in mils printed on the core or the edge tape. If the label is gone, a roofer can match profile and granule blend on sight. The OEM-versus-aftermarket decision here isn’t dramatic: matching the existing IKO line keeps the system warranty intact and avoids an odd roofline seam that a future inspector will flag. When we source, that’s the call we make with you, not for you.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your IKO Home Additions & ADU Is Failing
Here’s what usually shows up before an owner calls us:
- Hairline cracks at the tie-in wall. The new addition moves slightly against the original structure, and the joint where the two meet opens up. Left alone for a season, that crack lets in the wind-driven rain North Miami gets every June through October.
- Ceiling stains that come back after patching. A stain that returns means the moisture source is still active. On an addition with an IKO roof assembly, the culprit is often a flashed seam at the transition that wasn’t stepped correctly.
- Shingles lifting or curling at the addition roof. Too few fasteners, or the wrong fastener length for the deck, shows up fast in South Florida’s heat. Curling along a ridge or valley edge is the first clue.
- Soft spots or bubbling underfoot on the new slab or floor. In a garage conversion or ADU slab, this often traces to moisture management under the finished floor rather than the IKO material itself.
- Water stains at the base of exterior walls. Poor drainage at the soil line, combined with our flat lots and heavy rain, sends water back against the structure. That’s an addition detailing problem, not a parts problem, but owners often assume it’s the roof.
Replacement Cost & What’s Included

In North Miami, we price this work the way we price everything: a written number before any work starts, and the number on day one is the number on the invoice.
- Home addition: $53,100 – $153,400
- ADU construction: $106,200 – $259,600
- Garage conversion: $35,400 – $94,400
What drives the number up: footprint and roofline complexity, whether the tie-in requires re-flashing an existing IKO roof assembly, impact-rated windows (a must on most North Miami additions), and ADU-specific work like separate utility meters and a second kitchen or bath rough-in. What keeps it down: reusing the existing garage footprint for a conversion, keeping the new roofline simple, and matching IKO components to what’s already there instead of tearing off and starting fresh.
The range includes labor, materials sourced from recognized trade brands (IKO for the roof system, KraftMaid and Wellborn cabinetry, Cambria and Silestone countertops if the project includes a kitchen), permits pulled and inspections passed, and our written guarantee. If anything we built fails within 365 days, we come back and fix it at no charge. That’s the 365-Day Done Right Promise, and it’s in writing on every project.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Some of this you can safely check on your own. Walk the perimeter after a hard rain and look for staining or soft spots. Read the shingle wrapper in the garage and write down the IKO line and color. Photograph any crack at the tie-in wall next to a tape measure so a professional can see scale.
Where DIY goes wrong is at the tie-in detail and anywhere water management matters. A homeowner can patch a crack in an afternoon. Getting the flashing right at a roof-to-wall transition on a North Miami addition is a different job that needs the right tools and the right material selection. The cost of getting it wrong the second time – re-opening finished walls, re-doing drywall and paint – usually dwarfs what the original repair would have cost. Call us before you start cutting.
Call (888) 255-7411 and we’ll come look at it, walk you through what we see, and give you a written price. Estimate is free, and a live person answers the phone any hour you call.
FAQs

How long does an IKO-based addition or ADU last in North Miami?
Thirty years or more for the structure itself, and 20 to 25 for the roof assembly, though the South Florida sun and salt air will shorten that if the detailing is rushed. The IKO components do their job; the tie-in details decide whether the whole thing holds up.
Can the failing part be repaired instead of replaced?
Often yes, and we’ll tell you when that’s the honest answer. A localized shingle failure or a crack at the tie-in can usually be fixed without tearing out a wall. A failed underlayment across a whole roof section is a different story and usually means replacement. Call (888) 255-7411 – we’ll tell you which one you’re looking at, free.
How long does the swap take?
A localized repair to an IKO roof or tie-in detail is typically one to two days. A full home addition runs six to twelve weeks depending on size, weather, and inspection scheduling. An ADU can run four to eight months. We give you a real arrival window and a written schedule before we start.
How do you source IKO parts for my project?
We source through our established material suppliers and match the IKO line already on your roof so the system warranty stays intact. We don’t stock parts on a truck or in a warehouse – every part is ordered for your specific project and specified in your written estimate before work begins.
Get Started
If your North Miami addition or ADU needs attention – a crack that’s spreading, a roof transition that’s leaking, a garage conversion that never quite finished – the next step is a phone call and a written price. We’re a Penhallow Remodeling team, and every project gets a written number up front, background-checked and uniformed technicians on the job, and the 365-Day Done Right Promise if anything we touched goes wrong. Call (888) 255-7411 for a free estimate on your North Miami home addition or ADU. A live person is there to pick up, day or night.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.












