







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tremron Bathroom Remodeling: The North Miami Owner’s Guide
Tremron bathroom remodeling in North Miami typically runs $10,620 to $33,040 for a full bath, and most of that spread comes from tile selection, substrate repair, and whether the shower gets rebuilt or just re-set. We’re an independent remodeling company and not affiliated with Tremron, but we install Tremron pavers and tiles in bathrooms across North Miami and know where their products fail in South Florida humidity. We can usually get a written number to you within a day of measuring, though the work itself is scheduled, not same-day.
Owners rarely call us because a tile “broke.” They call because the bathroom smells faintly of damp even after cleaning, because a grout line near the shower pan keeps darkening no matter how many times it’s scrubbed, or because a hollow thud echoes underfoot when they step out of the shower. Those are the signals we hear most in North Miami.
Which Tremron Models This Applies To

Tremron makes pavers primarily, and many North Miami homeowners end up with their products in bathrooms through a previous owner’s renovation, a covered patio conversion, or a bathroom that borrowed exterior-grade pavers for a wet room floor. The most common lines we encounter in residential bathrooms are the Olde Towne, Chesapeake, and Plaza series, along with a few discontinued patterns from the mid-2000s. Each has a distinct face profile and nominal thickness, and the sizing matters: a Chesapeake paver is not interchangeable with an Olde Towne paver, and the grout joint width changes with the pattern. If you’re matching a partial repair, pull one loose or damaged piece, measure the long edge, short edge, and thickness in millimeters, and photograph the face under daylight. That’s what gets you the right product.
On the OEM-vs-aftermarket question: Tremron’s own product line is typically the right match when you’re replacing more than a few pieces, because color batches drift between production runs and a close-aftermarket match often shows as a slightly different tone once it’s wet. For a single cracked piece under a vanity or behind a toilet, a quality aftermarket equivalent that matches thickness and face texture is often the practical choice. We always price both so you can see the difference in writing before any work starts.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Tremron Bathroom Remodeling Is Failing
- Hollow sound and flex underfoot. Usually means the thin-set bond has failed and the paver is resting on air, often after moisture worked under the edge at a doorway transition.
- Persistent grout darkening near the shower. Grout that stays dark after cleaning is absorbing water, which points to a failed sealant joint or a compromised waterproofing layer behind the tile.
- Efflorescence (white powdery bloom). Minerals wicking through from behind the paver. In North Miami it’s often a sign moisture is trapped against the substrate.
- Lipped or uneven edges between pieces. A piece that sits proud of its neighbor is usually debonding, not settling, and it’s a trip edge underfoot in a wet room.
- Recurring mildew in an otherwise clean bathroom. Often the substrate or the cavity behind the wall is staying damp, and no amount of surface treatment fixes it.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
| Work | North Miami Range |
|---|---|
| Full bathroom remodel | $10,620 – $33,040 |
| Small bathroom remodel | $5,900 – $14,160 |
| Walk-in shower installation | $5,310 – $14,160 |
| Tub-to-shower conversion | $4,130 – $11,800 |
| Shower replacement | $3,540 – $10,030 |
| Bathroom vanity installation | $945 – $3,540 |
What drives the number up: substrate replacement (cement board behind the tile, the moisture-resistant layer), waterproofing membrane, and whether the shower gets a new pan. What holds it down: keeping the existing layout and reusing fixtures that are still sound. We price parts and labor as separate lines so you can see what the material costs and what the install costs. Every job is covered by our 365-Day Done Right Promise in writing.
DIY or Call Us?
You can safely check a few things yourself: press a hand on suspect floor pieces to feel for flex, look for the hollow sound test with a coin, check the manufacturer label inside a vanity cabinet or on the original delivery paperwork, and inspect the caulk line where floor meets wall for gaps. Stop there. Replacing an embedded paver, re-setting a shower pan, or opening up a wall to check waterproofing means cutting into a wet-room assembly, and if the substrate underneath is wet, patching over it just hides the problem for a season. It fails again three months later, which is exactly the cycle most of our North Miami customers are trying to break. Call (888) 255-7411 and we’ll give you a written assessment before anything is touched.
FAQs

How long does Tremron tile or paver last in a North Miami bathroom? Expect 15 to 25 years on a properly installed bathroom floor, but only if the substrate stays dry. In South Florida humidity, a poor waterproofing job can cut that to five years or less. Call (888) 255-7411 if you’re past the ten-year mark and seeing any of the symptoms above.
Can it be repaired instead of replaced? Often yes. A single debonded piece can be lifted, the substrate dried and re-prepped, and the piece re-set, and a failing grout line can be raked and re-sealed. If the waterproofing behind the assembly is compromised, repair is a band-aid and we’ll tell you that directly. We give you both prices in writing.
How long does the swap take? A single-piece floor repair is typically a one-day job. A full shower pan rebuild or floor replacement is two to five days depending on substrate condition and whether new pieces need to be ordered. You’ll get a defined start date and a real arrival window, not a “sometime next week.”
How do you source the part? We identify the Tremron series from your existing piece (or the original paperwork), order through the manufacturer or a recognized trade supplier, and confirm batch match before install. We also install KraftMaid cabinetry, Cambria and Silestone counters, and Kohler and Moen fixtures if your remodel grows past the floor.
If you’re in North Miami and your bathroom needs more than a patch, call Penhallow Remodeling North Miami at (888) 255-7411 for a free estimate. We answer live 24/7, we give you a written price before any work starts, and the number on day one is the number on the invoice.
Written by the team at Penhallow Remodeling North Miami, serving North Miami and nearby areas.












